Installation Manual For 2009 CUSD Control System: LIGHTING Rev. 1.0 Note: This is the manual for the guy installing the control system and th
7. Test out the devices. You should be able to control the switches/outlets from the computer. (ISY User Guide, Pages 18-19) To Control the Lighti
9. Click Import Lighting Data and click Browse. 10. Find the file you just saved earlier (in the Desktop, maybe). 11. Click Import. On the right pane
Hardware Installation/Wiring Protocol - Lighting This is the protocol for hard-wiring the sub-circuits together with the control board, connecting w
4. Connect a 2200 ohm resistor from the “+” terminal of Output 2 on the M1EZ8 Control Board to the “-” terminal. (Cross Platform Control Installation
8. Connect a CAT5 RJ45 cable from the “Network” Port on the Insteon ISY-99i/IR Pro to a router. (Universal Devices Tech Support, 818-631-0333) 9.
Configuration/Setup Protocol - Lighting This is the protocol for setting up and configuring the hardware with the software. This includes ma
4. In Account ID, type in a name (e.g. CUSD House) 5. In System Type, select EZ8. 6. Type in the Serial Number that is located on the sticker on t
2. Make sure that the UPnP line is enabled on the left-hand column so that it says “Hide icons for networked UPnP devices”. 3. A web browser (it wo
Linking Insteon Devices to ELK Protocol - Lighting This protocol is two part: the first is for linking Insteon switches and outle
without having to turn it on from the switch, you could do that – you can't do that in the 2nd config). Note that the load wire on the switch is
Comentários a estes Manuais